Introduction
Working for our good friends at Terrain Surveys, we were contracted to undertake full PAS128 Type B Utility Surveys at the location of the proposed Sizewell C Power Station, and surrounding infrastructure areas.
The Survey
Working on high-profile projects such as this can be very difficult. Many of the survey areas were rural or greenfield land, and habitats for rare plants and wildlife, such as Bats, Badgers, Marsh Harriers and other protected species. Working alongside the Ecology teams was essential to help minimise the impact on these species.
The Results
A full PAS128 Utility Survey was provided to help enable a basic design in preparation for the works. The survey was undertaken to a very high standard and delivered within strict timescales.
To find out more on PAS128 Type B Utility Surveys contact Amethyst Surveys.